The project comprises of the A&A works for existing Tung Chung Citygate Outlets at Lot 2 while retaining the existing 24/7 operating Public Transport Terminus (PTT). Meanwhile Lot 11 comprises of a 13-storey hotel and retail complex with 2 levels of basement carpark and PTT at G/F.
Major sustainable construction achievements of Mr. Wan includes:
- Promote the use of saw cutting as major demolition method
- Utilize existing building structure to solve the problem of water leakage and waste water treatment
- Improve the environment of public area by improving tidiness and ventilation
![](/images/case_studies_photo/034/Photo 1.jpg)
Improve ventilation of public transport terminal
![](/images/case_studies_photo/034/Photo 2.jpg)
Coordinate recycle of construction waste such as wood waste
![](/images/case_studies_photo/034/Photo 3.jpg)
Coordinate with engineers to help maximize saw cutting as major demolition method