The project comprises of the A&A works for existing Tung Chung Citygate Outlets at Lot 2 while retaining the existing 24/7 operating Public Transport Terminus (PTT). Meanwhile Lot 11 comprises of a 13-storey hotel and retail complex with 2 levels of basement carpark and PTT at G/F.
Major sustainable construction achievements of Mr. Wan includes:
- Promote the use of saw cutting as major demolition method
- Utilize existing building structure to solve the problem of water leakage and waste water treatment
- Improve the environment of public area by improving tidiness and ventilation
Improve ventilation of public transport terminal
Coordinate recycle of construction waste such as wood waste
Coordinate with engineers to help maximize saw cutting as major demolition method